Cliftonville FC Following the success of the installations at Portadown FC and Glentoran FC we were appointed to carry out the installation at Cliftonville FC. The Irish Football Association recognised the need for the premiership clubs to have a new standard of flood lighting. Braham Electrical have installed a state of the art scheme given an average Lux level of 850 Lux. Client: Cliftinville FC & The IFA Architect: None PQS: Braham Electrical Civil/Structural Engineers: £255,000.00 M&E Engineers: Semple & McKillop Duration: 2 Months Location: Belfast Date: October 2009
Coleraine FC Following the success of the installation at Portadown FC we were appointed to carry out the installation at Coleraine FC. The Irish Football Association recognised the need for the premiership clubs to have a new standard of flood lighting. Braham Electrical have installed a state of the art scheme given an average Lux level of 850 Lux. This contract involve the replacement of the existing cables PILS cables with PVC/SWA/PVC cables. All work was carried out to the 17th edition of BS7671 IEE wiring regulations. Client: Coleraine FC & The IFA Architect: None PQS: Braham Electrical Civil/Structural Engineers: £255,000.00 M&E Engineers: Semple & McKillop Duration: 2 Months Location: Coleraine Date: October 2009