Completed Projects



Cliftonville FC
Following the success of the installations at Portadown FC and Glentoran FC we were appointed to carry out the installation at Cliftonville FC. The Irish Football Association recognised the need for the premiership clubs to have a new standard of flood lighting. Braham Electrical have installed a state of the art scheme given an average Lux level of 850 Lux.
Client:  Cliftinville FC & The IFA
Architect:  None
PQS:  Braham Electrical
Civil/Structural Engineers:  £255,000.00
M&E Engineers:  Semple & McKillop
Duration:  2 Months
Location:  Belfast
Date:  October 2009



Coleraine FC
Following the success of the installation at Portadown FC we were appointed to carry out the installation at Coleraine FC. The Irish Football Association recognised the need for the premiership clubs to have a new standard of flood lighting. Braham Electrical have installed a state of the art scheme given an average Lux level of 850 Lux. This contract involve the replacement of the existing cables PILS cables with PVC/SWA/PVC cables. All work was carried out to the 17th edition of BS7671 IEE wiring regulations.
Client:  Coleraine FC & The IFA
Architect:  None
PQS:  Braham Electrical
Civil/Structural Engineers:  £255,000.00
M&E Engineers:  Semple & McKillop
Duration:  2 Months
Location:  Coleraine
Date:  October 2009

Copyright © Braham Electrical 2009.
7A Charlotte Street Warrenpoint Co. Down BT34 3LF
 Home   Services   Projects   About Us   News    Contact Us      Email: info@brahamelectrical.com     Tel: +44 (0)28 4177 2989    Designed By Eweb

 Staff
 Email
 Login